Akron WRF Step Feed Phase 2
2460 Akron-Peninsula Road, Akron, Ohio 44313
Donley’s, Inc. encourages bids from all qualified subcontractors/suppliers included MBE, WBE and SBE firms for the Akron WRF Step Feed Phase 2 project until 12:00pm EST on June 7, 2016
Project Description:
The project consists of constructing of refurbishing eighteen final settling tanks with new sludge collection equipment; construction of new hydraulic conduits and channels, refurbishing of six aeration basins with new gates, piping, and diffuser systems; refurbishing screw pump stations and building; replacing existing process valves and flow meters; refurbishing HVAC, electrical and lighting; aeration gallery window, doors and roof replacement. Also included in this project are site utilities, masonry, structural steel, misc. steel, steel stairs, carpentry, waterproofing, doors, frames and hardware, glass and glazing, painting, signage, louvers, conveying systems, etc.
It is the aim of the City to encourage the participation of EDGE-certified and/or MBE-certified firms located in the City in the proposal. The Contractor shall comply with that goal and award 18% of the contractor’s final contract value, including labor and materials to EDGE-certified and/or MBE-certified firms located in the City.
The project includes the City of Akron’s Local Hiring and Workforce Participation Policy as required by the Project Labor Agreement entered into with respect to CSO construction. Local Hiring and Workforce Participation Requirements: Total Project Work Hours by Trade: for all contracts for covered projects, the mandatory participation level in terms of project work hours to be performed by local residents, by trade, is 50% for construction.
Please direct all questions and inquiries regarding this project to Tim Mescher or Pete Dorio at 216-524-6800 or by email totmescher@donleyinc.com and pdorio@donleyinc.com.